Exposé / Appraisal
"The waste water of the Wartburg - Eisenach in present and future"
For the waste water disposal of the Wartburg were five variants inspected
in the year 1999. These contain the construction of an own purification
plant or the transition and the connection to the purification plant
Eisenach.
Title photo from the documentations
|
|
For the preferred variant
Construction of a pumping plant and a waste water pressure pipe with connection to the
water net and the purification plant Eisenach
in 2004 the services
- permit planning
- execution planning
- submission
- constructional supervision
were furnished.
|
|
|